Liquid-cooled bitcoin mining container featuring a redundant cooling system, integrated dry cooler, and high-quality components engineered for reliability.

Efficient and Refined Design.​

The Giga Box Hydro™ incorporates a closed-loop, stainless steel cooling system rated for 45°C ambient temperatures, ensuring efficient heat management.

15” HMI display & Siemens PLC

3-Phase 415/240V electrical system

Why Choose Giga Box Hydro™?​

A powerful centerpiece for your mining operations.​

Enterprise-Grade Cooling System

Integrated dry cooler and redundant cooling pumps to maintain optimal temperatures. ​

Integrated Electrical Panel

Equipped with a 3-Phase 415/240V electrical system and distribution panel for streamlined power management.​

Smart Monitoring & Controls

Includes a 15” HMI display and Siemens PLC to monitor and control system parameters effectively.​

Custom Skid Solutions

Offers tailored skid-mounted hydro cooling solutions for indoor installations without containers.

Proven Reliability

Designed with high-quality components to ensure dependable performance in demanding environments.​

Indoor & Outdoor installation

Optional skid-mounted hydro cooling solutions for non-containerized applications.

Standard Capabilities

Integrated Electrical Panel:

  • 3-Phase 415/240V electrical system with integrated distribution panel.​

Integrated Dry Cooler:

  • Pre-installed, closed-loop, stainless steel cooling system rated for 45°C ambient temperatures.​

Redundant Cooling System:

  • N+1 redundant primary water pumps with an auxiliary pump to maintain stable system pressure.​

Smart Monitoring & Controls:

  • 15” HMI display and Siemens PLC for monitoring and controlling flow, pH, pressure, TRT, and more.​

Optional Specifications

Custom Skid Solutions:

  • Designed for non-containerized applications, providing plug-and-play solutions tailored to specific project needs.

GigaBox Hydro™. Built to order.

8-12
Weeks

Built to Order

Our team collaborates with you to understand your requirements and manufacture mining infrastructure that meet your specifications.

Build a quote

customer stories

Satisfied Customers Across the Country

"The 3000 kVA padmounts not only arrived on the tight timeline, but we've been satisfied with the quality of the equipment since the site was energized."

“Our electricians let us know multiple times how much they prefer the GIGA PDUs and equipment to anything else they have installed. It’s the best packaging and delivery on any single piece of infrastructure we ordered.”

Marc S.
Field Technician

Seamless sourcing experience.

Giga makes the experience of purchasing mining infrastructure as seamless as possible. From initial quote to ongoing support, our expert team is committed to guiding you through every step of the journey with ease.

Build a quote

01

Place your order

02

Approve design drawings

03

Receive order updates

04

Receive your GigaBox Hydro™

05

Enjoy ongoing support

06

Explore other product lines

Our extensive selection of custom-built solutions and comprehensive inventory ensures that we can provide the perfect transformer to power your projects.

3-Phase Padmount Transformers

Explore

Giga Box Air™

Explore

Substation Transformers

Explore

Let’s build what’s next together.

70.9
"
82.7
"