]

Distributors

Built for distributors

We partner with electrical distributors to streamline inventory, shorten lead times, and provide top-quality transformers and switchgear to end user projects.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

No long lead times. No wondering who you are working with.

Consistent, On-Time Supply

We build our lines of UL-Listed transformers and switchgear to meet or exceed NEMA, ANSI, IEEE, and DOE standards.

Competitive Pricing Without Compromise

Same-day quotes. On-time shipping. Warranties that deliver what they promise — without weeks of wait time or surprise charges.

Expert Support & Co-Selling Resources

Transformers in 12-20 weeks. Switchboards in 9-12 weeks. For both made-to-order and inventory, quality products delivered fast is our default.

products

Transformers and switchboards for your critical projects.

transformers

Transformers delivered fast

Giga offers a broad line of padmount, substation, polemount, and dry-type transformers both made-to-order and in stock inventory that meet applicable UL®, ANSI®, and IEEE® standards.

3-Phase Padmount Transformers

Three-phase pad-mounted transformers are designed to provide underground or throated power distribution to commercial and industrial loads.

Explore

Substation Transformers

High-voltage liquid-filled power substation transformers are designed to provide efficient power distribution for utility companies and large industrial complexes.

Explore

1-Phase Padmount Transformers

Single-phase pad-mounted transformers are designed to provide underground power distribution to commercial and residential loads.

Explore

Modular Switchboards

UL 891 Switchboards

Manufactured in California, USA, our line of UL 891 switchboards are designed to safely distribute power to industrial and commercial loads while protecting branch circuits - all with voltage ratings up to 4000A 480V and breakers up to 2000A 600V.

Explore

Built in California, USA

Customizable Design

Fast Lead Times

Robust Warranty & Support

customer stories

Satisfied Customers Across the Country

Delivered 9 Transformers in 14 weeks for an expedited data center rush order

"The 3000 kVA padmounts not only arrived on the tight timeline, but we've been satisfied with the quality of the equipment since the site was energized."

Energized 6 1.4 MW containers & PDUs in West Texas

“Our electricians let us know multiple times how much they prefer the GIGA PDUs and equipment to anything else they have installed. It’s the best packaging and delivery on any single piece of infrastructure we ordered.”

Why choose us

Here for distributors from drawings to delivery.

American Engineering

Manufacturing facility in Los Angeles, CA.

Testing & Approvals

High-quality production with rigorous testing.

Delivery & Support

Reliable logistics and ongoing customer support.

Customization & Lead Times

Tailored to project specifications without the wait.

Let’s build what’s next together.

70.9
"
82.7
"