Bitcoin Mining
Built for bitcoin mining operations.
Scaling a Bitcoin mining operation is more than just securing ASICs—it requires efficient power infrastructure and rapid deployment solutions.








Built by Miners, for Miners
Rapid Deployment
We build our lines of UL-Listed transformers and switchgear to meet or exceed NEMA, ANSI, IEEE, and DOE standards.
Optimized Cooling & Airflow for Peak Performance
Same-day quotes. On-time shipping. Warranties that deliver what they promise — without weeks of wait time or surprise charges.
Reliable Power Distribution
We manufacture mining-specific transformers that optimize power distribution, reduce energy losses, and handle high-load mining environments—ensuring stable uptime and maximum profitability.
.jpg)
products
Plug-and-Play Bitcoin Mining Infrastructure
Giga Box Air™
Plug & play air-cooled bitcoin mining container designed for ultimate reliability and simplicity with powerful exhaust fans and high quality components.
Powerful Fans & Filtration
Quality Electrical Components
Plug & Play Design

Giga Box Hydro™
Liquid-cooled bitcoin mining container with a redundant cooling system, integrated dry cooler, and quality components built for reliability.
Integrated Dry Cooler
Redundant Cooling System
Smart Monitoring & Controls

transformers
Transformers delivered fast
Giga offers a broad line of padmount, substation, polemount, and dry-type transformers both made-to-order and in stock inventory that meet applicable UL®, ANSI®, and IEEE® standards.

3-Phase Padmount Transformers
Three-phase pad-mounted transformers are designed to provide underground or throated power distribution to commercial and industrial loads.

Substation Transformers
High-voltage liquid-filled power substation transformers are designed to provide efficient power distribution for utility companies and large industrial complexes.

1-Phase Padmount Transformers
Single-phase pad-mounted transformers are designed to provide underground power distribution to commercial and residential loads.
customer stories
Satisfied Customers Across the Country
Delivered 9 Transformers in 14 weeks for an expedited data center rush order
"The 3000 kVA padmounts not only arrived on the tight timeline, but we've been satisfied with the quality of the equipment since the site was energized."
Energized 6 1.4 MW containers & PDUs in West Texas
“Our electricians let us know multiple times how much they prefer the GIGA PDUs and equipment to anything else they have installed. It’s the best packaging and delivery on any single piece of infrastructure we ordered.”
Why choose us
Here for mining operations from drawings to delivery
American Engineering
Manufacturing facility in Los Angeles, CA.
Testing & Approvals
High-quality production with rigorous testing.
Delivery & Support
Reliable logistics and ongoing customer support.
Customization & Lead Times
Tailored to project specifications without the wait.
Let’s build what’s next together.
